New synchronizing equipment to La Estrella / Los Valles, Panama.

The turbine governors (HPC640) delivered by Alstom Power 2006 and 2007 for the two units in La Estrella and the two units in Los Valles, were re-build. They are now equipped with synchronizing function including speed control, voltage control and closing of the generator breaker.