Neoen are building a power reserve (battery, 40MW/40MWh) in Storen, Sweden. The main purpose is to provide FCR services to the Nordic Grid. Nidec Industrial Services deliver the Battery Energy Storage System (BESS), and I have been sub-contracted by Nidec to help them qualify the new plant as a FCR supplier.
I will do simulations, prepare a test program, assist during the tests and finally prepare test protocols for SVK.