Pre-commissioning of control system in Dönje, hydro power station.

The turbine and generator are refurbished. VOITH Hydro deliver a new excitation system and a new turbine governor. Included in the delivery is an adaptation of the application SW in the unit controller, adapted to the new instrumentation of the turbine and generator.

I have updated the SW for the unit controller (HPC Compact, based on AdvantController 110).