Test of FCR in Isbillen Power Reserve.
FCR qualifications tests specified by SVK (Swedish TSO) were carried out by Nidec, and my task was to support during the FCR tests, evaluate the
FCR qualifications tests specified by SVK (Swedish TSO) were carried out by Nidec, and my task was to support during the FCR tests, evaluate the
Sollefteåforsen have discussed to install a battery energy storage system (BESS) close to Sollefteå hydro power station. I have helped them investigating different alternatives for
Uniper wanted to investigate implications when their hydro power plants need to renew FCR tests according to new requirements. Will it still be possible to
AES Panama has ordered additional spare parts for the 6 turbine governors, 4 brushless and 2 static excitation systems delivered by HydroCon 2021-2023.
AES Panama has decided to install efficiency monitoring systems in the power plant La Estrella and Los Valles, totally 4 units, and the project has
Downing, an English invetment company, owns a great number of small hydro power plants in Sweden. I have helped them investigating which one of those
A new FCR function was implemented and tested in Blåsjön hydro power station. FCR qualifications test specified by SVK (Swedish TSO) were carried out by
I have performed a pre-study investigating different solutions for a hybrid power plant (hydro power units together with a battery energy storatge system) providing FCR
Fortum are going to refurbish G2 in Dönje. Old frequencu control tests shows that the unit would not fulfil the requirements for FCR. Fortum wanted
New turbine governors were installed and commissioned on unit #1 in both power plants. The equipment was delivered by HydroCon, with ABB Finland as sub-contractor.
New turbine governors were installed and commissioned on both units. The equipment was delivered by HydroCon, with ABB Finland as sub-contractor.
I have done a guarantee inspection limited to the electrical parts (Balance of Plant) in the refurbished power plant Blankaström.