On behalf of SWECO, I have been doing re-commissioning of the turbine governor and excitation system (G1 and G2) in La Estrella, Panamá. The reason for the re-commissioning was that ABB Mexico replaced the control system. I was also acting as a supporting commissioning manager to AES Panamá (plant owner).