I have updated the engineering stations to ControlBuilder 1.4 (compatible with Windows 7). The work was first done in Barcaza, which is a power station in Colón with 7 diesel generators installed on a ship. I then did the same work in the hydro power stations in Bayano, Estí, La Estrella and Los Valles.
CND (National Grid) had requested step response tests of voltage and frequency to be done and documented in Bauano and Estí, and I trained the AES staff how to proceed when doing these tests.