Investigation of turbine governor performance in Dönje G2 hydro power station.

Fortum are going to refurbish G2 in Dönje. Old frequencu control tests shows that the unit would not fulfil the requirements for FCR. Fortum wanted to investigate if this was due to settings in the governor, restrictions on the hydraulic systems or possibly due to turbine and waterways.