FCR qualifications tests specified by SVK (Swedish TSO) were carried out by Nidec, and my task was to support during the FCR tests, evaluate the test results and prepare the test protocols for application to SVK.
Bredhälla BESS (Battery Energy Storage System) has a capacity of 42.5 MW and 42.5 MWh build in municipality of Uppvidinge, Kronoberg, and owned by Flower Technologies. It was delivered by the French company Nidec Industrial Services.