Test of FCR in Storen Power Reserve.

FCR qualifications tests specified by SVK (Swedish TSO) were carried out by Nidec, and my task was to support during the FCR tests, evaluate the test results and prepare the test protocols for application to SVK.

Storen Power Reserve is so far Sweden’s largest battery energy reserve with a capacity of 52MW and 52 MWh build in municipality of Ragunda, Jämtland and owned by Neoen. The battery energy storage system (BESS) was delivered by the French company Nidec Industrial Services